Construction near the entrance to the Alex Fraser Bridge from Nordel Way. (Grace Kennedy photo)

Work begins on Alex Fraser Bridge counterflow lane

$70-million project is expected to be complete in fall 2018

Construction has begun on a new moveable counterflow lane on the Alex Fraser Bridge.

Crews started on the first phase of the project Dec. 4, working to to remove the existing cast-in-place concrete barrier and install a new traffic signal and lighting at the Nordel Way northbound on-ramp intersection. This work is expected to be completed at the end of May 2018.

After that, work will begin on the project’s second phase, modifying the existing six lanes on the bridge and removing the shoulders to bring the total number of travel lanes to seven, and installing a moveable barrier that can be shifted to accommodate peak traffic periods with the help of a machine known as a “road zipper.”

Lindsay Transportation Solutions, a U.S.-based subsidiary of Lindsay Corporation, will provide the moveable barrier and two road zippers, and will manufacture the components in California and Nebraska. The contract is valued at approximately $20 million.

The majority of the work will be done at night so as to minimize the project’s impact on traffic, and three lanes will remain open in each direction during the day.

The new counterflow lane is expected to be complete in fall 2018. To accommodate the seven lanes, the speed limit over the bridge will be reduced from 90 to 70 km/h. Cyclist and pedestrian access will not be affected.

The $70-million project, first announced on January 19, 2017 by then-Transportation Minister Todd Stone, will be partially funded by the federal government, to the tune of $33,965,000, through the provincial-territorial infrastructure component of its New Building Canada Fund. The province is picking up the tab for the remaining $36,125,000.

“Our government is committed to finding solutions that will reduce gridlock, so people can spend less time stuck in traffic and more time with their families,” said Minister of Transportation and Infrastructure Claire Trevena in statement released on Dec. 21. “Installing a moveable barrier system on the Alex Fraser Bridge will bring congestion relief for commuters who frequently use this crossing.”

Also included in the bridge improvement project will be 13 dynamic message signs to be placed strategically around Metro Vancouver to advise motorists in real time of delays on the four major Fraser River crossings: the Alex Fraser, Port Mann and Pattullo bridges and the George Massey Tunnel. That part of the project will go to tender in the spring of 2018.

According to the government’s webpage for the Alex Fraser improvement project, an average of more than 119,000 vehicles use the bridge every day, with drivers experiencing lines more than three kilometres long during rush hour.

Once work is complete, the ministry says, bridge users can expect to save about 12 to 16 minutes during the afternoon rush hour in the southbound direction and about six minutes during the morning rush hour in the northbound direction.

Rush hour congestion has been an ongoing source of frustration for regular users of the Fraser River crossing, prompting local and provincial governments to implement a number of projects and initiatives aimed at easing traffic both on and off the bridge.

In October 2016, the transportation ministry installed a traffic light at the Highway 91 southbound off-ramp to Cliveden Avenue on Annacis Island in order to dissuade drivers from using the industrial area as a means of bypassing bridge traffic. At the same time, Delta Police stepped up traffic enforcement on the island in the hopes of catching so-called bridge cheaters.

The tactic of southbound drivers using the long Annacis off-ramp, turning around on the island and then rejoining Highway 91 caused near-gridlock on the island, prompting businesses and employees to complain that their ability to move on or off the island is impeded, and Delta Police and Delta Fire to voice their concerns regarding access to the island in the event of an emergency.

In December 2016, construction began on a new interchange at 72nd Avenue that would eliminate the only traffic light on the Highway 91 corridor and a major choke point for traffic. Work is expected to last through to winter 2018.

Some drivers hoped the lifting of tolls on the Port Mann and Golden Ears bridges on Aug. 31 would ease congestion on the Alex Fraser, but according a report by City of Delta staff released in November, that hasn’t been the case.

Citing transportation ministry numbers, the report says that while volume did increase on the Port Mann and Golden Ears — by 27 and 30 per cent, respectively — neither the George Massey Tunnel nor the Alex Fraser saw a noticeable change in traffic. The Pattullo Bridge, meanwhile, did see a 12-per-cent drop in traffic.

– with files from Katya Slepian and Jeff Nagel



editor@northdeltareporter.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Horgan says Surrey mayor opened ‘hornets’ nest’ with Surrey policing transition

Surrey election battle heating up over Doug McCallum’s controversial cop transition

OUR VIEW: Way too many Surrey COVID-19 cases

We all need to take this threat seriously

‘Illegal’ Canadian crab traps, fishing gear seized in U.S. waters near White Rock

Investigation continues after joint operation between Canadian, American authorities in Boundary Bay

OPINION: It’s Time for Surrey to be Heard

Which party will listen to Surrey voters?

COVID-19 exposures at Surrey schools: An updated list

Fraser Health has created a new webpage listing COVID-19 cases in schools

B.C. reports 91 new cases as officials remain worried over ‘clusters of COVID-19

There have now been a total of 8,395 cases in B.C. since the pandemic began

Canada’s active COVID-19 cases top 10,000 as daily new cases triple over the past month

Dr. Tam repeated her warning to young people, who have made up the majority of recent cases

First 8 months of fatal overdoses in B.C. have now exceeded 2019 death toll

Nine people died every two days in August, BC Coroners Service data shows

Liberal effort to reset policy agenda panned by rivals as too much talk, not action

Trudeau said it’s ‘all too likely’ families won’t be able to gather for Thanksgiving next month

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Return-It depots change beverage container deposits from 20 to 10 cents

Change will be implemented on Oct. 1, with a transition period being held until Oct. 11

‘Show us the money’ for cannabis, local governments tell B.C.

Municipal tax, transit revenues falling as costs rise

Young man assaulted, left for 12 hours until help called in Vancouver’s Strathcona Park

Vancouver police are looking to identify the victim as they investigate an assault on Monday evening

Most Read