Coastal FC photo The recently opened BMO Coastal Soccer Centre features a turf playing surface that is about half the size of a regular pitch.

Coastal FC to host grand-opening event for new indoor soccer centre

Facility now open at South Surrey Athletic Park

Coastal FC is set to celebrate its new indoor soccer facility with a grand-opening celebration this weekend.

The South Surrey soccer club will host an event Saturday (June 15), from 11 a.m. until 2 p.m. at the site of the new facility, the BMO Coastal Soccer Centre, which is located in the northeast corner of South Surrey Athletic Park.

The facility has been open since earlier this spring, and has been well-received by club members, Coastal FC executive director Chris Murphy told Peace Arch News.

“The response has been really good. I think the full benefit will be realized when the weather outside is colder and wetter, but we’ve had it open since mid-April, and for the most part, the programs we’ve ran there, the feedback has been excellent,” he said, adding that there are still a few cosmetic touches left to add to the facility.

“The priority was getting people inside and onto the playing surface,” he said.

• READ ALSO: Coastal FC to unveil new indoor facility

Construction began on the site last fall, and the project – which cost $5 million – is fully funded by Coastal FC on land leased to them by the City of Surrey.

The centre includes an indoor playing surface that is 110 yards long by 35 yards wide – about half the size of a normal field – which Murphy told PAN earlier this year is perfect for the club’s youngest players, who don’t yet play on full-size pitches.

“I think it’s been cool for the little ones, because for them, it kind of feels like a little stadium environment,” he said.

“From the moment we opened the doors, you could tell it was going to be a major asset to the club and the players who get in there.”

In addition to Coastal’s youngest members, others to have used the facility so far include adult players as well as high-level academy players who “have been able to get a little extra training in.”

Saturday’s grand-opening will include a ribbon-cutting and speeches from various club members and dignitaries, as well as a bouncy castle and face-painting, carnival games and a by-donation barbecue lunch.

For more on the facility, visit www.coastalsoccercentre.ca

soccer

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

Just Posted

All Safe Surrey Coalition council members must ‘step up’ over ‘bad taste’ tweets, rivals say

Slate’s posts on social media in ‘bad taste,’ councillor says

First degree murder charge laid in South Surrey shooting death

Wayne Duncan, 46, was killed on Sept. 6, 2019

Surrey sports groups grapple with refunds, registration, restrictions and more

‘Our biggest problem is going to be retraining the public because they can’t be there’

Facing changes together: Your community, your journalists

The COVID-19 pandemic has changed the world in ways that would have… Continue reading

Low-cost bicycle repair shop opens in Cloverdale

Cloverdale Community Cycles starts up in church parking lot

VIDEO: A Vancouver Island black bear takes weekend nap in eagle tree

Videos captured by Terry Eissfeldt shows the bear arriving Saturday night and sleeping in on Sunday

Two more COVID-19 cases reported by Langley long term care facility

One resident, one staffer have tested positive for the coronavirus

George Floyd asphyxiated by sustained pressure: family autopsy

Death sparked a wave of protests across the U.S. and abroad

Suspect sought in alleged assault, hate crime on Metro Vancouver bus: transit police

The woman then allegedly punched the teenager in the head multiple times

COVID-19: B.C. commercial landlords can’t evict if they decline rent assistance

Emergency order ‘incentive’ for federal program, Carole James says

B.C. Hockey League prepping for 2020-21

League reviewing different scenarios and start times in compliance with provincial regulations

Abbotsford International Airshow opening 50-year-old time capsule

Bronze time capsule was put together to commemorate AIA as Canada’s National Airshow

Trans Mountain starts B.C. leg of pipeline twinning project

Mostly finished in Alberta, Burnaby terminal expanding

Most Read

l -->