Minister of Education Rob Fleming was in South Surrey Friday to help break ground on the new Grandview Heights Secondary, and symbolically break ground on a new elementary school for the Douglas area. Fleming also announced funding to complete the land assembly for a new elementary in the Sunnyside neighbourhood. (Tracy Holmes photo)

Construction launched for South Surrey high school

Education minister announces $6M for completion of land for new school in Sunnyside neighbourhood

After years of anticipation, construction began on South Surrey’s newest high school Friday (May 17).

With an excavator working in the distance, representatives from the province, school district and City of Surrey gathered at the site – in the 16900-block of 26 Avenue – to officially break ground on Grandview Heights Secondary.

Board of Education trustee Laurae McNally told Peace Arch News it was an occasion she’s waited eight years for.

“Finally,” she said, prior to a news conference, holding her pink hard hat in hand.

The occasion was also a symbolic groundbreaking for a new 605-seat elementary school in the Douglas neighbourhood – budgeted for up to $33.1 million – in the 17200-block of 2 Avenue.

As well, Minister of Education Rob Fleming announced funding – $6 million in all, including $3.6 million from the province and $2.4 million from the school district – to “complete the assembly of the site needed to build a much-needed elementary school in the Sunnyside neighbourhood.”

“This is exciting news for families,” Fleming told attendees.

The 630-seat Sunnyside-area school is slated for property at the corner of 20 Avenue and 165A Street.

Surrey School District officials had announced May 15 that construction contracts had been awarded for the high school and the elementary school.

Fleming on Friday confirmed Port Moody-based Yellowridge Construction Ltd. will be building the secondary school, while Clark Construction won the elementary school contract.

The 1,500-seat secondary school is anticipated to open in September 2021 – a year later than initially hoped. Fleming said the province had to add $32.6 million to the budget “to ensure it could go ahead and benefit students as fast as possible.”

Last October, school district officials confirmed the project had been delayed as a result of “changing market conditions” that meant it could no longer be built within its $60.6 million budget.

READ MORE: Grandview Heights Secondary delayed

Spokesman Doug Strachan told PAN that actual construction costs will be around $68 million, with the balance to cover costs of necessary infrastructure such as sewer and roads.

In addition to Fleming, Board of Education chair Laurie Larsen and acting Mayor Laurie Guerra spoke at Friday’s event.

 

Grandview Heights Secondary. (CHP Architects graphic)

Just Posted

COLUMN: ‘Trudeaumania’ unlikely to strike for third time in Surrey

Surrey has been solidly red the past two years in Ottawa, with… Continue reading

’Wham-bam out the door,’ South Surrey man warns of landscaping solicitor

Resident warns neighbours to be careful of door-to-door salesmen

UPDATE: Man arrested in fatal stabbing near Clayton Heights gas station

Victim pronounced deceased at the scene; RCMP cordon off area

Windfall for Deltassist from Delta brewery’s fun run

Four Winds Brewing Company’s third annual Winded 5K raised a record $11,809.53

Reach Society granted $20K to help lessen counselling waits

The funds were granted from the First West Foundation’s Envision Financial Community Endowment

VIDEO: Langley woman’s security camera records its own theft

Langley family discovers early morning grab was recorded

Canadian Snowbirds plane crashes before air show in Atlanta

Pilot lands safely after ejecting from jet

Share crash data, private insurers tell David Eby, ICBC

B.C. monopoly makes drivers retrieve their own records

B.C. VIEWS: Wolf kill, not backcountry bans, saving caribou

B.C.’s largest herds turn the corner from extinction

Vancouver Giants wrap up prairie road swing with a 4-2 win over Regina

Milos Roman paced the Langley-based Giants with two goals, goaltender David Tendeck made 34 saves

Pearson nets shootout winner as Canucks clip Flyers 3-2

Vancouver picks up second straight home win

Map on Elections Canada website sends Nanaimo-Ladysmith voters to landfill

Address for polling station correct, but Google Map address differs

BC Children’s Hospital launches 2 new virtual care sites bringing total to 19 across province

Provincial initiative allows pediatric patients to see health specialists through video

Most Read

l -->